FCT Infrastructure: Wike Decries Construction Pace At Outer Southern Expressway Leading To Wassa
The Federal Capital Territory’s Minister, Nyesom Wike, Has Decried The Pace Of Work At The Ring Road 1 And 2, Which Is Expected To Link The Villa Roundabout To Gwagwalada.
FCT Correspondent, Joy Igoche, Reports Wike As Calling On The Federal Capital Development Authority (FCDA), And The Contractors To Go Back To The Drawing Board.
Follow Us For More Via:
www.itvradiong.com/live
www.youtube.com/itvradiong
www.facebook.com/itvradiong
www.twitter.com/itvradiong
www.instagram.com/itvradiong
www.tiktok.com/@itvradiong